F050730-R2-06-6A.jpg
F050730-R2-26-26A_edited.jpg

15,327m

Stormwater

Pipe Laid

+ Box Culverts, Pits, Kerb Inlet Units, Gross Pollutant Traps, and more!

41,798T

Material Excavated

Including contaminated materials, remediation works, sandstone, and more!

12,942m

Conduits Installed

+ ULX, Combined Service Routes, ITS, Concrete encasement, and more!

1,254m3

Concrete

Poured

Including Kerbing, In Situ Pits, Slabs, Cable Trench walls, Channel Drains, and more!

OUR CLIENTS

PROJECTS

SYDENHAM STATION UPGRADE
1/1

press to zoom

press to zoom

press to zoom

press to zoom
1/24
Scope
- Earthworks including Excavation and Ground Stabilisation
- FRP Channel Drain, Retaining Wall, and Stitch Pours, OHW footings
- 310m of Precast Retaining Wall Installation under LVL5 restrictions
WESTCONNEX IRON COVE LINK
1/1

press to zoom

press to zoom

press to zoom

press to zoom
1/13
Scope
- Earthworks including detailed excavation in rock, saw cutting, and bulk excavation 
- Stormwater Drainage up to 1050 pipes
- Night Shift drainage works 
LAPSTONE STATION UPGRADE
1/1

press to zoom

press to zoom

press to zoom

press to zoom
1/51
Scope
- Demolition of Existing structures
- Stormwater Drainage
- FRP Retaining Wall, Stairs, Kerb
- Regrading to new levels
- Asphalting, Signage and Linemarking
MARRICKVILLE STORMWATER DRAINAGE
1/1

press to zoom

press to zoom

press to zoom

press to zoom
1/24
Scope
- Demolition of 2747T of heavily reinforced concrete  
- Rocksawing 1879m 
- Excavation in 4170 tons of rock 
- Installation of 3835m of stormwater drainage FRC pipes
- 1411m3 concrete poured