PROJECTS

SYDENHAM STATION UPGRADE
1/1

1/24
Scope
- Earthworks including Excavation and Ground Stabilisation
- FRP Channel Drain, Retaining Wall, and Stitch Pours, OHW footings
- 310m of Precast Retaining Wall Installation under LVL5 restrictions
LAPSTONE STATION UPGRADE
1/1

1/52
Scope
- Demolition of Existing structures
- Stormwater Drainage
- FRP Retaining Wall, Stairs, Kerb
- Regrading to new levels
- Asphalting, Signage and Linemarking
WESTCONNEX IRON COVE LINK
1/1

1/13
Scope
- Earthworks including detailed excavation in rock, saw cutting, and bulk excavation 
- Stormwater Drainage up to 1050 pipes
- Night Shift drainage works 
MARRICKVILLE STORMWATER DRAINAGE
1/1

1/24
Scope
- Demolition of 2747 tons of heavily reinforced concrete  
- Rocksawing 1879m 
- Excavation in 4170 tons of rock 
- Installation of 3835m of stormwater drainage FRC pipes
- 1411m3 of concrete poured
HEATHCOTE ROAD UPGRADE
1/1

1/8
Scope
- Installation of 6.6km of CSR conduits under HV/LV lines 
- Installation of CSR pits 
- Removal of 3000m3 Stockpile
MT. COLAH ULX
1/1

1/10
Scope
- Possession Weekend
- Open Cut ULX and Installation of conduits under the Northern Railway line to provide power supply to provide wireless mobile phone coverage.
ROZELLE SUBSTATION
1/1

1/10
Scope
- FRP Substation cable trench and ground slab
- Installation of Conduits and Stormwater Drainage pipe and pits
- Kerb and Gutter
SYDNEY LIGHT RAIL
1/1

1/5
Scope
- Stormwater Drainage 
- FRP Kerb and Gutter
- Night Shift ITS works including reinstatement works
PARRAMATTA ROAD 
1/1

1/11
Scope
- Earthworks including bulk and detailed excavation
- Installation of Stormwater Pits
- Stormwater Drainage and concrete encasement
- Reinstatement of roads and foothpaths
GRANVILLE JUNCTION STATION
1/1

1/12
Scope
- Earthworks including trench excavation and site regrading
- Combined Service Route (CSR) installation 
PORT BOTANY DOCK REMEDIATION
1/1

1/9
Scope
- Removal of existing asphalt
- Sand Stabilisation and Strengthening 
- Installation of new asphalt 
- Linemarking
MARRICKVILLE STABLING YARD
1/1

1/3
Scope
- Installation of Stormwater Drainage pits and pipes
- Connection to Reinforced Concrete Box Culvert
LAKE MUNMORAH
1/0

1/12
Scope
- Bulk and Detailed Excavation 
- Rocksawing 

CONTACT US

Projects

Number: 0402 679 141

Email: projects@kanecivil.com.au

General Enquiries

Number: 0481 787 319

Email: info@kanecivil.com.au

Kane Civil Pty Ltd.

3/87 Sydenham Road,

Marrickville, NSW, 2204

ABN: 75 607 573 893

DOWNLOAD OUR CAPABILITY STATEMENT